The Federal Government has signed a contract with Infiouest International Limited for the construction of the Calabar-Ebonyi-Benue-Kogi-Nasarawa-Abuja Superhighway to boost the country’s transportation ecosystem.
Speaking during the signing ceremony in Abuja, Minister of Works, David Umahi, thanked President Bola Tinubu for his inclusive leadership and the distribution of the dividends of democracy.
Umahi also explained that the Legacy Project is strategic for boosting transportation along the economic corridors of the South East and North Central, noting that it would stimulate trade along the regions and foster inter-regional cohesion, cooperation, and collaboration.
He noted that the project will create a seamless movement of goods and services between the Southeast and Northern routes of the road and further the road infrastructure revolution master plan in keeping with the tenets of inclusive leadership in the country.
According to Umahi, the Federal Ministry of Works has also signed a contract with Infiouest International Limited for the construction of Enugu/Abakaliki/Ogoja Highway (Africa Trans-Sahara route) cutting across Cross River, Benue, Kogi, Nasarawa States and terminating in Apo in Abuja.
The Works Minister argued that the project will consist of the reconstruction of the existing jointed, asphalt concrete and laterite surfaced road pavements from Ndibe beach, traversing through Eke Market.
Others, Abaomege, Onueke, Achiagu, Umuoghara/Onu Nwafor, Ukwuachi, Ishieke, Odomoke before terminating at Mbeke in Ebonyi is the third Project spanning 118.85km and it is to be constructed on Continuously Reinforced Concrete Pavement (CRCP).
He assured that the four projects are not just transformational but also critical investments that would turn around the socio-economic fortunes of the country, stimulate diversification, and enhance a more sustainable transportation ecosystem.
Umahi therefore thanked Mr. President for carrying on the execution of the inherited road projects across the 6 Geo-Political zones, including the South East, believing, Lagos – Calabar 750 kilometers sections 1 and 2, construction already are going on very well.
“Despite legal action, the project is a must. We’re supporting Mr. President to have that project accomplished. It is an investment. Very soon, we are starting 3A and 3B in Cross River and Akwa Ibom,” Umahi said.
The Minister argued, “There is Sokoto-Badagry Superhighway, 1,068 kilometers. Two sections are already ongoing. The biggest of the project is the Kebbi section, 258 kilometers. It’s ongoing. We’ve flagged off, and we have paid the first mobilization fee.”
Speaking after signing the contract, the Managing Director of the company, Mr. Joseph Abou Jaounde promised to justify the confidence reposed on them, saying, “We have to carry on with this goal, and we have to prove that we trust in the right place.”